SCPM Project

A deliberate force in a stormy industry.

Run every job with discipline – before the margin walks off the site.

SCPM Project is construction management built on a framework, not a feature list. It guides your firm through the structured way to run the work and scores how disciplined each project is – so the problems that quietly eat your margin surface weeks before they cost you.

5

departments, one system

0–100

Health Score per job

1

built-in accounting engine

🔒app.scpmproject.com/dashboard
SCPM Project executive dashboard — SCPM Health, KPIs, and the Actionable Intelligence panel

The real SCPM Project – flip through the actual screens. Every number ties to a posting.

The four-minute tour

Watch the whole system run

Twenty-five real screens, from the first deal to closed books – every frame captured from the live product.

The problem

Margin doesn't vanish in one bad day. It leaks.

An unlogged change. A sub invoice nobody reconciled. A schedule slip nobody flagged. A closeout that dragged for months. By the time it shows up in the financials, it's already history – and the industry's answer has been more tools: one app for the field, one for the office, spreadsheets in between, email holding it together. Every handoff is a place where money leaks.

SCPM Project takes the opposite approach: one system, one source of truth, one disciplined way to run a construction business – from the first lead to the final lien waiver.

Where the margin leaks

  • 01Unlogged change events
  • 02Unreconciled sub invoices
  • 03Silent schedule slips
  • 04Closeouts that never close
0Health Score

The SCPM Health Score

One number tells you if a job is being run right.

Every project – and your company as a whole – carries a single 0–100 score measuring operational discipline: daily-log completion, budget and schedule variance, RFI response times, submittal punctuality, closeout progress, and sub insurance currency. Executives see at a glance not just how a project is doing financially, but whether it's being run right – which is what determines how it does financially.

  • ✓Composite of seven live operational signals
  • ✓Rolls up per project and company-wide
  • ✓Red / Amber / Green across the whole portfolio
  • ✓No competitor offers an equivalent

Built-in accounting engine

The operations and the books were never two systems to begin with.

SCPM Project comes with the complete SCPM Construction Accounting engine already inside it – not a connector, not a lite version. Append-only ledger. AIA billing. WIP in two modes. Certified payroll. Every dollar traces to a budget line, so field reality and financial reality never drift apart.

  • ✓Six-column job cost – budget, committed, actual, projected, variance
  • ✓One-click WIP for the surety; cost-to-complete for the PM
  • ✓Change orders update the budget the moment they're approved
  • ✓Clean CSV / Excel / PDF export for your accountant

Want the accounting engine on its own? It's also sold standalone as SCPM Construction Accounting.

🔒app.scpmproject.com/projects/oldicecreamshoppe/budget

Northside Distribution

63%

Complete · 5.3% margin

57

5d

Behind

1

Open RFIs

23

Today's crew

3

Deliveries

Log today's work ›
Photos & punch ›
Time entry ›

Job dashboard, offline-ready

Daily log

Syncing
☀️ 78°FClear

Work performed

Set steel bays 4–6, east elevation; poured slab area 2; ran underground sanitary grid C.

IMGIMGIMG
Hold to dictate

Daily log — voice or tap

Built for the jobsite, not the office

Your superintendent's whole day, from their phone – even with no signal.

Daily logs with weather, crews, and photos. Time tracking. RFIs and submittals. Punch lists, safety observations, sub performance, material deliveries, field-initiated change events. Full offline mode – everything queues on the device and syncs when signal returns, because jobsites don't have conference-room Wi-Fi.

  • ✓Speak or type the day; AI drafts the log for your review
  • ✓Photos tagged and linked to the daily log
  • ✓Field change events flow straight to a draft change order
  • ✓Works offline, syncs automatically

AI embedded, not bolted on

AI drafts. A human always approves.

AI is embedded in every layer, doing the paperwork that keeps your best people from managing work: CRM summaries and follow-ups, voice-driven daily logs, RFI and change-order drafting, margin-erosion prediction, and an assistant on every screen that can walk you through a task and coach each role. It drafts, watches, scores, and coaches – and a human always approves before anything is saved.

How SCPM Project compares

See where SCPM Project stands against the field.

CapabilitySCPM ProjectProcoreJobTreadBuildertrendRedTeam
Operational-discipline framework the software enforces✓✗✗✗✗
Single blended project health score✓Add-on✗✗✗
Native general ledger accounting, not an integration✓✗✗✗✗
Native multi-entity accounting: separate books + consolidation✓✗✗✗✗
Certifiable WIP schedule, reconciled to a native ledger✓✗✗✗✗
Certified payroll (WH-347)✓Add-on✗✗✗
AI quantity takeoff from drawings✓Add-on✗✗✗
AI margin- or schedule-risk prediction✓Add-on✗✗✗
Field-service arm: work orders, inventory & deferred revenue✓✗✗✗✗

Verified August 2026 against each vendor's public product documentation and current third-party reviews. “Add-on” means available only through a paid add-on module, a third-party integration, or in limited/early-access form – not a standard native capability. Verify current capabilities with each vendor.

Bring your history with you

Currently on another platform? Your data comes with you.

Nearly all of the history in your current construction-management system – your jobs, contacts, books, and cost history – can be exported and brought straight into SCPM Project. The small amount that has to be moved by hand, we handle ourselves as a white-glove service, so you start with your history in place, not an empty screen.

The story

Evaluate. Recommend. Educate. Monitor.

Conquest Consultants – a consulting practice that fixes the structural problems eroding GC margin – developed the SCPM Framework and proved it in the field before building software. SCPM Project is the framework made operational, running that four-phase loop continuously across every project you own.

01

Evaluate

The Health Score, project diagnostics, and gap-identification reports.

02

Recommend

In-app alerts and guided prompts the moment a structural gap appears.

03Coming

Educate

Role-based curriculum and certification that builds the discipline in.

04

Monitor

The executive dashboard, margin-erosion alerts, and the ongoing score.

Stop storing your projects. Start running them with discipline.

Win the work, build the work, bill the work – in one system, scored for discipline at every step.