SCPM Project

A deliberate force in a stormy industry.

Run every job with discipline – before the margin walks off the site.

SCPM Project is construction management built on a framework, not a feature list. It guides your firm through the structured way to run the work and scores how disciplined each project is – so the problems that quietly eat your margin surface weeks before they cost you.

5

departments, one system

0–100

Health Score per job

1

built-in accounting engine

🔒app.scpmproject.com/dashboard
SCPM Project executive dashboard — SCPM Health, KPIs, and the Actionable Intelligence panel

The real SCPM Project — flip through the actual screens. Every number ties to a posting.

The problem

Margin doesn't vanish in one bad day. It leaks.

An unlogged change. A sub invoice nobody reconciled. A schedule slip nobody flagged. A closeout that dragged for months. By the time it shows up in the financials, it's already history – and the industry's answer has been more tools: one app for the field, one for the office, spreadsheets in between, email holding it together. Every handoff is a place where money leaks.

SCPM Project takes the opposite approach: one system, one source of truth, one disciplined way to run a construction business – from the first lead to the final lien waiver.

Where the margin leaks

  • 01Unlogged change events
  • 02Unreconciled sub invoices
  • 03Silent schedule slips
  • 04Closeouts that never close
0Health Score

The SCPM Health Score

One number tells you if a job is being run right.

Every project – and your company as a whole – carries a single 0–100 score measuring operational discipline: daily-log completion, budget and schedule variance, RFI response times, submittal punctuality, closeout progress, and sub insurance currency. Executives see at a glance not just how a project is doing financially, but whether it's being run right – which is what determines how it does financially.

  • Composite of seven live operational signals
  • Rolls up per project and company-wide
  • Red / Amber / Green across the whole portfolio
  • No competitor offers an equivalent

Built-in accounting engine

The operations and the books were never two systems to begin with.

SCPM Project ships with the complete SCPM Construction Accounting engine already inside it – not a connector, not a lite version. Append-only ledger. AIA billing. WIP in two modes. Certified payroll. Every dollar traces to a budget line, so field reality and financial reality never drift apart.

  • Six-column job cost – budget, committed, actual, projected, variance
  • One-click WIP for the surety; cost-to-complete for the PM
  • Change orders update the budget the moment they're approved
  • Clean CSV / Excel / PDF export for your accountant

Want the accounting engine on its own? It's also sold standalone as SCPM Construction Accounting.

🔒app.scpmproject.com/projects/northside/budget

Continental Logistics · commercial

2024-0911 · Northside Distribution Center

Edit job+ Document+ Change order+ Daily log
DashboardBudgetChange ordersCommitmentsBillsSub pay appsPay appsDocumentsRFIsScheduleDaily logsPunch listFiles

Revised budget

$14,880,400

Committed

$13,905,200

Cost to date

$9,412,880

Cost to complete

$4,760,900

Projected final

$14,173,780

Projected margin

5.3%

Cost codeDescriptionBudgetCommittedCost to dateTo completeProjectedVariance
01-000General Requirements1,204,0001,180,500812,400372,0001,184,400+19,600
02-000Sitework & Earthwork1,910,0001,974,3001,701,900281,4001,983,300−73,300
03-000Concrete2,640,5002,588,0002,101,600486,4002,588,000+52,500
05-000Structural Steel3,180,0003,244,7002,410,000840,0003,250,000−70,000
07-000Thermal & Moisture1,088,9001,012,400588,300430,0001,018,300+70,600
09-000Finishes1,742,0001,689,900612,7001,079,2001,691,900+50,100
23-000HVAC1,455,0001,488,600701,980792,0001,493,980−38,980
26-000Electrical1,660,0001,626,800484,0001,148,9001,632,900+27,100
Total — all divisions14,880,40013,905,2009,412,8804,760,90014,173,780+706,620

Every figure ties to a posting — cost-to-date pulls from committed POs, subcontracts, and vendor bills; cost-to-complete and projected margin update the moment a change order is approved.

Open change orders

View all →
CO-014Owner-requested dock levelers+$142,300Approved
CO-017Unforeseen rock excavation+$88,400Pending
CO-019Electrical service upgrade+$61,200Draft

Committed vs budget, by trade

Structural Steel
102%
Sitework & Earthwork
103%
Concrete
98%
HVAC
102%
Electrical
98%

Northside Distribution

63%

Complete · 5.3% margin

57

5d

Behind

1

Open RFIs

23

Today's crew

3

Deliveries

Log today's work
Photos & punch
Time entry

Job dashboard, offline-ready

Daily log

Syncing
☀️ 78°FClear

Work performed

Set steel bays 4–6, east elevation; poured slab area 2; ran underground sanitary grid C.

IMGIMGIMG
Hold to dictate

Daily log — voice or tap

Built for the jobsite, not the office

Your superintendent's whole day, from their phone – even with no signal.

Daily logs with weather, crews, and photos. Time tracking. RFIs and submittals. Punch lists, safety observations, sub performance, material deliveries, field-initiated change events. Full offline mode – everything queues on the device and syncs when signal returns, because jobsites don't have conference-room Wi-Fi.

  • Voice or type the day; the log structures itself
  • Photos tagged and linked to the daily log
  • Field change events flow straight to a draft change order
  • Works offline, syncs automatically

AI embedded, not bolted on

AI drafts. A human always approves.

AI is embedded in every layer, doing the paperwork that keeps your best people from managing work: CRM summaries and follow-ups, daily-log auto-fill, RFI and change-order drafting, margin-erosion prediction, and a construction assistant you can ask anything. It drafts, watches, scores, and coaches – and a human always approves before anything is saved.

How SCPM Project compares

See where SCPM Project stands against the field.

CapabilitySCPM ProjectProcoreJobTreadBuildertrendRedTeam
Proprietary operational-discipline framework
Composite 0–100 operational health score
Full accounting engine built in (GL, WIP, AP/AR)Partial
Native CRM + estimating + bid-levelingPartialPartial
AI tied to margin/schedule coaching, not just automationPartialPartialPartial

The story

Evaluate. Recommend. Educate. Monitor.

Conquest Consultants – a consulting practice that fixes the structural problems eroding GC margin – developed the SCPM Framework and proved it in the field before building software. SCPM Project is the framework made operational, running that four-phase loop continuously across every project you own.

01

Evaluate

The Health Score, project diagnostics, and gap-identification reports.

02

Recommend

In-app alerts and guided prompts the moment a structural gap appears.

03Coming

Educate

Role-based curriculum and certification that builds the discipline in.

04

Monitor

The executive dashboard, margin-erosion alerts, and the ongoing score.

Stop storing your projects. Start running them with discipline.

Win the work, build the work, bill the work – in one system, scored for discipline at every step.