Department 02 · Design
Preconstruction, organized.
Design is the preconstruction hub – where client direction, drawings, specifications, and early budgets come together before a shovel hits the ground, so the job starts on solid footing.
CSI
spec organization
Full
revision history
1
source of truth
What lives here
Everything the Design team runs, in one place.
Client & preconstruction
- ✓Client interaction and preconstruction RFIs
- ✓Design-phase budgets and scheduling
- ✓Contracts and early scope definition
Documents & specifications
- ✓Plans and documents, with the current set always surfaced
- ✓Specifications managed by CSI division
- ✓Automatic revision supersession with full history preserved as drawings evolve
The current set, always.
Upload a new plan revision and it supersedes the old one for everyone automatically – with the full history kept – so no one ever builds off a stale drawing.
Continental Logistics · commercial
2024-0911 · Northside Distribution Center ▾
Original contract
$14,138,000
Approved COs
+$742,400
Revised contract
$14,880,400
Pending / draft
+$149,600
Margin impact
+0.4%
| CO # | Description | Type | Cost | Total w/ markup | Status | Age |
|---|---|---|---|---|---|---|
| CO-011 | Added mezzanine steel & stair | Owner | $186,200 | $204,820 | Approved | 42d |
| CO-012 | Revised fire-suppression routing | Design | $74,500 | $81,950 | Approved | 35d |
| CO-013 | Upgraded dock equipment package | Owner | $228,000 | $250,800 | Approved | 28d |
| CO-014 | Owner-requested dock levelers | Owner | $129,364 | $142,300 | Approved | 14d |
| CO-017 | Unforeseen rock excavation | Field | $80,364 | $88,400 | Pending | 6d |
| CO-019 | Electrical service upgrade | Design | $55,636 | $61,200 | Draft | 2d |
| CO-016 | Substituted skylight assembly | Design | $41,000 | $45,100 | Rejected | 9d |
Approve a change order and the budget, projected margin, schedule of values, and the owner pay application all move together — no double entry, no reconciliation, nothing papered twice.